What breaks at an ERP go-live, and what work around the new system gets left out of the plan?

The ERP usually works on the first morning. What breaks is what sat around the old one: integrations, reports, scheduled jobs, printed documents and access that no module covers.

The ERP itself usually works on the first morning. What breaks is what sat around the old system: the integrations that fed it, the reports and spreadsheets that read from it, the jobs that ran overnight, the documents it printed and the access people had. These get missed because an implementation plan is organized by the ERP’s modules, and most of this work belongs to no module.

Nobody is at fault for that. The pieces around an old ERP were built over many years by different people, and no single list of them exists. This checklist is a way to make that list. Go through it with your ERP partner and mark each item with who will do it.

Integrations and file transfers

  • List every system that sends data to the old ERP or reads from it. Record the direction and what it carries. An integration that is on no list is rebuilt by nobody.
  • Look for file drops and scheduled imports. A nightly file in a shared folder is an integration, and it is usually undocumented.
  • Find everything that reads the old database directly. A hosted ERP may not allow direct access, so each of these needs a new route.
  • Tell your trading partners early. Customers and suppliers who exchange orders and invoices electronically have to test with you, on their calendar.
  • Check the bank, payroll and tax connections. Payment files, payroll journals and sales tax calculation each have a provider with its own format and its own testing process.
  • Decide what happens when an integration fails. Someone has to be told, and there has to be a way to resend the record.

Reports and the spreadsheets behind them

  • List the reports people open, and who opens them. The old system holds far more reports than anyone uses. Its usage logs, or a week of asking, will show which ones matter.
  • Find the reports that connect straight to the old database. BI dashboards, spreadsheet connections and small databases stop refreshing on the day of the cutover.
  • Walk through the month-end close. The close usually depends on exports and workbooks that are in nobody’s plan.
  • List what is sent outside the company. Bank reporting, board packs and customer statements have dates that do not move for a go-live.
  • Decide where history will live. Agree how many years of detail move into the new ERP, and where the rest can be read.

Customizations and scheduled jobs

  • List every custom field, screen and rule in the old system. Each one becomes configuration, an extension, a change in process, or is dropped. Someone has to make that decision for each.
  • List the scheduled jobs. Overnight postings, reorder calculations, alert emails and cleanup scripts ran for years without anyone watching them.
  • Look for logic inside the old database. Triggers and stored procedures did work that no user ever saw.
  • Check every add-on product. Each one either has a version for the new ERP or needs a replacement.

Documents, labels and devices

  • Collect a sample of every printed and emailed document. Invoices, purchase orders, statements, checks and packing slips have layouts that customers and banks expect.
  • Test labels, scanners and printers where the work is done. A barcode label that will not scan stops a warehouse.
  • Check the portals and email notices customers see. They often read from the old system.

Data

  • Separate open transactions from history. Open orders, open invoices and balances have to be right on the first day, and history can follow.
  • Clean the master data before it moves. Duplicate customers and inactive items are easier to fix in the old system than in the new one.
  • Reconcile opening balances with finance. Finance should sign off on the trial balance, receivables, payables and inventory before anyone posts in the new system.

Access and controls

  • Rebuild roles and approval limits on purpose. Copying the old permissions carries over every exception that was made over the years.
  • Create the accounts the integrations run under. They should belong to the company and to no one person.
  • Confirm what the auditors expect to see. Ask them before the cutover which records of changes and approvals they will want.

The cutover and the weeks after

  • Rehearse the cutover with real data. A rehearsal shows how long each step takes and which ones fail.
  • Agree on the point of no return. Decide in advance who can call a return to the old system, and until when.
  • Plan the first month-end close. It is the first full test of the new system, and it comes when the project team is most tired.
  • Name who supports the integrations after go-live. The ERP partner’s support usually covers the ERP. The connections around it need an owner too.
  • Keep read-only access to the old system. Check when its license and hosting end before you count on it.

What to do with the list

Give every item one of four marks: in the partner’s scope, in your team’s, someone else’s, or not needed. Any item with no name beside it is where to look first. Which of your systems and processes depend on one person? helps with the items only one person can explain.

If the project exists because Dynamics GP is reaching the end of support, there is time to do this before the contract is signed. Microsoft’s announcement says product support and updates end on December 31, 2029, and security patches end on April 30, 2031.

Common questions

Isn’t this the ERP partner’s job? Some of it is, when it is written into the statement of work. A partner scopes what it is asked for and what it has been told about. The list of what surrounds your old system is knowledge only your company has, so bring the list and agree on a name for each item.

When should we go through this list? Before the statement of work is signed, because that is when the scope and the price are set. If you have already signed, do it now. An item found during testing can still be planned for, and one found on the first morning cannot.

Can we go live and fix the integrations afterward? Only the ones where a person can do the job by hand for a few weeks, and only if you have named that person. An integration that touches customers, cash or payroll needs to work on the first day.

How do we find the things nobody remembers? Look at what connects to the old system’s database, the scheduled tasks on its servers and the shared folders it writes to. Then ask each department what it does at month end and what it sends outside the company.

If the integrations around the new ERP are the part of the plan with no owner, Integrations & APIs describes how we scope and build them, starting with a fixed-fee System Evaluation.

Related service: Integrations & APIs