The only person who knows the system gave notice. What do you capture in two weeks?

Capture access first, then how to keep the system running and recover it, then how to release a change, and last what the person carries in their head.

Capture access first, then how to keep the system running and recover it, then how to release a change, and last what the person carries in their head. Do not spend the two weeks asking them to write documentation. Have the person who will take over do each task while the one who is leaving watches, and record every session.

Two weeks is long enough to make sure you can get in, keep the system running and change it, and to learn where the risks are. It is not long enough to pass on an understanding of the system.

What to settle on the first day

  • Name who is taking over. It may be a colleague, you, or an outside engineer for now. The work below needs a second person in the room from the start.
  • Stop the person’s other work. What they know is worth more than the feature they were finishing. Half-finished work is either completed in the first few days or written up as it stands.
  • Hold changes to the system, apart from fixes. Every change made now is one the next person did not see.
  • Ask the person what you need to know. They know the list better than you do, and most people who have carried a system for years want to leave it in good hands.

Follow your HR team’s process for the departure itself. Everything here is about the system.

1. Access, in the company’s name

Access comes first because it is the one part that can become impossible once the person has gone, and some of it takes days. A vendor may need a signed request to change an account’s owner.

Go through this list with the person.

  • Administrator accounts. The application, the servers, the database and the cloud account each get a second administrator today.
  • Accounts registered to their email address or phone. The domain registrar, DNS, vendor portals, app stores, the certificate provider and license keys.
  • Sign-in codes that go to their phone. Move them to a method more than one person controls.
  • Passwords, API keys and encryption keys that are in their head or their own files. Move them to the company’s password manager.
  • The source code. All of it belongs in the company’s repository, including the branches and scripts that exist only on their laptop.
  • Anything that runs under their own user account. Scheduled tasks, services, integrations and report subscriptions stop when that account is disabled.
  • Certificates and renewals, each with its expiry date.

Do not disable or change anything yet. Make the list, add the second administrator, and plan the changes for after the last day, when you know what depends on each account.

2. Keeping it running and getting it back

Next comes the knowledge you would need at two in the morning. Write one page: where the system runs, how to tell whether it is working, how to restart it, how to restore it from backup, what breaks most often and what fixes it, and who to call. How do you reduce key-person risk on a small IT team? describes that page in more detail.

Then test it. The person taking over restarts the system and restores a backup into a test environment while the departing person watches. If the restore has never been tried, these two weeks are the time to find out whether it works.

3. Releasing a change

A system you can keep running and cannot change is safe only until the first urgent fix. The person taking over gets the code from the repository, builds it on their own machine and releases one small, real change to production. The departing person watches and speaks only when something is about to go wrong.

Each place where this fails is something that existed on one laptop: a configuration file, a particular version of a tool, a step done by hand. Write each one down. If the system cannot be built from the repository at all, stop and fix that before anything else on this list.

4. What runs on a schedule and what it is connected to

  • Scheduled jobs. Nightly, monthly and yearly. Ask the person to walk through what they did at the last year-end, because nobody else was watching.
  • Integrations and file transfers. What moves, where it goes, what happens when it fails, and who is at the other end.
  • Vendors. Support contracts, account contacts, and the person at a customer or supplier who sends the file.
  • The people in the business who depend on the system, and what they usually call about.

5. What only they know

Leave this for last, when the person taking over knows enough to ask good follow-up questions. Record a conversation built on questions like these.

  • What would you fix first if you had a month?
  • What should nobody touch, and why?
  • What do you do by hand that nobody asked you to do?
  • What is half finished?
  • What happened in the worst outage, and what did you do?
  • Which decisions would look strange to a newcomer, and what was the reason for each?

Use the answers to mark where the next person needs to be careful.

How to run the sessions

  • The person taking over does the task while the person leaving watches. A task that was only watched is soon forgotten.
  • Record the screen and the voice, and store the recordings where the company controls them. They may be the only documentation of the hard parts.
  • The person taking over writes the notes, and the departing person corrects them.
  • Hold a short session every day on a real task. A long presentation on the last afternoon comes too late to act on.

After the last day

Complete documentation, an explanation of the code and every improvement can wait. The following should not wait long.

Change the passwords and keys they knew, and remove their access through your normal process, in the order the list from step 1 shows is safe. Move anything that ran under their account to a service account.

Decide who owns the system from here: a colleague who is given the time, a new hire, or a partner. A hire usually takes longer than a notice period, so the cover you named on the first day has to last.

Then look for the next system that depends on one person. Which of your systems and processes depend on one person? is a checklist for finding the others before someone else resigns.

Common questions

Should the person spend the two weeks writing documentation? No. Writing is slow, and people leave out what they do by habit. Have the person who is taking over do each task while the one who is leaving watches, and record the sessions.

What if two weeks is not enough? It is not enough to pass on an understanding of the system. It is enough to secure the access, prove you can recover the system and release a change, and record what the person knows about the risks.

We have nobody to hand the system to. What then? Name someone anyway, even if it is you or an outside engineer for these two weeks. Somebody has to do the tasks while the person watches. The recordings and the access will serve whoever takes over for good.

Can we ask them to stay available after they leave? You can ask, and many people will answer a question or two. Arrange anything beyond that through HR. Plan the two weeks as though you will not be able to reach them.

Should we stop changes to the system? Hold everything except fixes until the person taking over has released a change without help. A new feature finished in the last week is one more thing only the departing person understands.

If nobody on the team can read the system once the person has gone, a System Evaluation gives you an independent written account of it for a fixed fee.