Assess five things, in this order: what would stop the business if it failed and whether you could recover it, who holds the access and the knowledge, what the company is paying for and committed to, what work is already in flight, and what the business thinks of IT. Leave the technology choices you would have made differently for later. By day 100 you want a written picture of what you inherited, a short list of risks with owners, and two or three things visibly fixed.
The order follows what can hurt you soonest. An outage or a lapsed contract will not wait until you have settled in, and from your first day they are yours to answer for.
Find out what would stop the business, and whether you could recover it
List the systems by what the business does with them: taking orders, billing, paying people, running production, serving customers. For each one, write down five facts.
- Where it runs and who supports it.
- When it was last restored from backup as a test. A backup job that reports success is not the same thing.
- Whether the platform under it still receives security fixes.
- What it is connected to.
- Who would be called if it went down tonight.
Run one restore test early, on the system the business could least do without. It tells you more about what you have inherited than any document will.
Get the access into the company’s name, and into your hands
You cannot be responsible for systems you cannot get into. Ask for the administrator accounts, the domain registrar, the owner login for each cloud account, the vendor portals and the emergency account. Check who else has each one.
Look for access that should have ended. People who left in the last year, former vendors and old service accounts are the usual places. Then check where the sign-in codes go. If they go to one person’s phone, or to the phone of the person you replaced, change that this week.
Which of your systems and processes depend on one person? is a checklist that covers the access and the knowledge together.
Learn who knows what, while they are still here
A change of leader is a moment when people reconsider their plans. Meet every member of the team one to one in the first few weeks and ask each the same questions. What do you run? What worries you? What would you fix first? What do only you know how to do?
Ask the same of the outside firms: the MSP, the software vendors, the contractor who built the reporting. Ask each what is in their scope and what is not. The gaps between those answers are where an outage finds nobody responsible.
Write down the names that come up alone. How do you reduce key-person risk on a small IT team? goes through what to do about them.
Read the contracts and the spending
Ask finance for every technology invoice from the last twelve months, and ask for the contracts behind them. You are looking for four things.
- Renewal dates and notice periods. A contract that renews automatically in your second month commits you to another term before you have formed a view. Put every date on a calendar.
- What each agreement covers. An agreement for managed services that covers the servers may not cover the application that runs on them.
- Licenses paid for and not used. Compare the counts with the people who sign in.
- Who owns custom work. For anything built for the company, read what the contract says about the code and the data. Ask counsel where it is unclear.
The invoices will also show you software that IT did not buy and may not know about. Note it and come back to it.
Find out what is in flight and what was promised
Your predecessor made commitments, and the business still expects them. List every project under way with its sponsor, what has been spent, what is left, and the date somebody was given.
Collect the open findings as well: the last audit, the last security assessment, the answers given on the cyber insurance application, and anything promised to a customer in a security questionnaire.
For each project, decide whether to continue it, pause it while you check it, or stop it. Stop very little in the first weeks. A project that looks wrong to a newcomer often has a reason behind it that nobody has told you yet.
Ask the business what it thinks of IT
Meet the CEO, the CFO and each department head. Ask what they depend on, what is slow, what they asked for and did not get, and what their people do in spreadsheets because the system will not do it. Ask the CEO directly what they hired you to change.
You will hear things the team did not mention, and the reverse. You will also learn which problems the business has stopped reporting because it no longer expects an answer.
Get an independent read on the systems nobody can explain
Most inherited environments have at least one of these: a custom application whose builders are gone, an integration nobody wants to touch, a database that feeds reports in ways nobody has drawn. Do not guess at them, and do not take a first impression of the code as a verdict.
Have an engineer who did not build the system read it and write down what it does, where it runs and what would break it. What Is a Software Audit, and When Do You Need One? describes what that kind of review examines.
What to leave alone at first
Leave the platform choices you would have made differently, the shape of the team, and the vendor list. You do not yet know why each is the way it is. The people who made those choices are also watching how you treat their work, and you will need them.
The exception is anything plainly dangerous. Fix that at once and explain why.
What to have in hand by day 100
- One page that lists every system the business depends on, with its owner, its support status and when it was last restored.
- The five risks that matter most, each with an owner and a date.
- A calendar of renewals and notice dates for the next twelve months.
- The list of projects, with your decision on each.
- Two or three fixes that people noticed: a tested restore, a second sign-in factor on every administrator account, a long-standing complaint from one department resolved.
- A short plan for the CEO: what you found, what you will do over the next two quarters, and what you need.
Common questions
Should I change anything in the first month? Fix what is plainly dangerous, such as an administrator account with no second sign-in factor or a backup nobody has restored. Hold the larger changes until you know why things are the way they are.
What if there is no documentation? That is common, and it is a finding in itself. Build the picture from the people, the running systems and the invoices, and write it down as you go so that the next person does not start from nothing.
How do I assess a custom application when the people who built it are gone? Start with what you can check without reading code: where it runs, who can release a change, whether the code is in a repository the company controls, and whether it can be restored. Then have an engineer who did not build it read it.
How much of what I find should I tell the CEO? Every risk that could stop the business, in plain terms, as soon as you are sure of it. Bring what you propose to do about each one. A CEO would much rather hear it from you in your second month than learn it during an outage.
If one of the systems you inherited is one that nobody left can explain, a System Evaluation gives you an independent written account of it for a fixed fee.