By the end of the first month a new engineer should have released real changes to production, be able to explain what your main systems do for the business, and know who to ask about each one. Getting there depends mostly on what you prepare before they arrive: working access, a named person beside them, and a small real task for the first week.
The list below is in order of priority. It covers the technical and team side. Your HR team’s process covers the paperwork, the benefits and the policies.
Before the first day
- The laptop is built and the accounts exist. A first day spent waiting for a login is wasted, and the new person notices.
- The access list is written down. Source control, the ticket system, the environments, the logs, the monitoring and the password manager. If nobody can list what an engineer needs, that is worth finding out now.
- One engineer is named to look after them. Give that person the time for it. Take something off their list for the month.
- The first task is chosen. Pick a small, real change that touches the release process and matters to somebody.
- The team and the business know who is coming. Say what the person will work on, so nobody greets them with a queue of old requests.
- The plan for the month has been sent to them. One page is enough. People arrive calmer when they know what the first week holds.
A working setup
- They can build and run the system from the written steps. Have them follow the setup page exactly and correct it wherever it is wrong. That page is tested only when a new person uses it.
- They can sign in to everything on the access list. Check each item together on the first morning.
- Production access is given when a task needs it. Start with the access the first tasks require and add to it as the work grows.
- They know the security basics for your environment. Multi-factor authentication, where secrets are kept, and what data may never leave a system.
- They know how a change reaches production. Walk through one recent release from the request to the deployment, including who approved it.
The systems and what they do for the business
- They have a one-page map of the systems. What each one does, who uses it, what it connects to and who on the team knows it best. If the map does not exist, drawing it is a good task for the first two weeks.
- They have spent time with the people who use the main system. An hour beside the order desk or the dispatcher explains more than a week of reading code.
- They know the vocabulary. Every company has its own words for customers, orders and locations. Give them a short list.
- They have read the last few incident write-ups. These show what breaks, and how the team behaves when it does.
- They know which parts are fragile. Tell them what the team is careful around and why. A new engineer finds the fragile part either way, and it is better that you told them.
- They have been told what not to read yet. Point them at the code that matters for the first tasks and leave the rest for later.
The first changes
- A small change is released in the first week. It goes through the normal process, with the normal review. It proves the setup works and gives the person something finished.
- The second task is larger and described by its outcome. Say what the change has to do and which tests it has to pass, and let them work out how.
- They explain their plan before they build. Ten minutes at this point catches a wrong direction while it is still cheap to correct.
- The first reviews are thorough. The standard you hold in the first month is the standard they will hold for the next hire.
- They watch a release and an on-call shift before they do either alone. Both are easier to learn beside someone than from a page.
Horizontally Scaling Your Development Team covers the same steps from the side of the engineer who is leading the work.
People and expectations
- A short daily check-in for the first two weeks. New people hold back questions because they do not want to interrupt. A fixed time removes the reason.
- A weekly one-on-one with you. Ask what is unclear, what surprised them and what they would change.
- They have met the business owner of each system they will work on. A request is easier to judge when you know who is asking and why.
- They know how work arrives and who sets its priority. Otherwise the first person to stop at their desk sets it.
- The goals for the month and for the first quarter are written down. Include what you expect them to have taken over, and by when.
What to hold back in the first month
- Being on call alone. They do not yet know what normal looks like.
- The system nobody else wants. Handing it to the newcomer on arrival is how a new engineer becomes the next person nobody can replace. How do you reduce key-person risk on a small IT team? covers how to share it.
- A large project with a fixed date. Give them time to learn the systems before a deadline depends on them.
- Every recurring meeting. Choose the two or three that teach the most.
How to tell whether it worked
At the end of the month, sit down with them and ask four questions.
- What have you released, and what did you learn from releasing it?
- Can you describe what each main system does and who depends on it?
- What was missing or wrong in what we gave you?
- What looks odd to you that the rest of us have stopped noticing?
The third answer goes into this checklist before the next hire. The fourth is worth more than it seems. A new engineer sees the manual step, the stale alert and the confusing name for a few weeks only, and then sees them the way everyone else does. Write the list down while they still can.
Common questions
How soon should a new engineer release something to production? In the first week, if your release process allows it. Pick a change that is small and real. It proves the access and the setup work, and it teaches the release process faster than reading about it.
When should a new engineer go on call? After they have shadowed a rotation and handled a problem with someone beside them. For most systems that is after the first month. Putting a new person on call alone tests your documentation at the worst possible time.
Who should look after the new engineer day to day? One named engineer on the team, with the time set aside for it. The manager still holds the weekly one-on-one. If looking after the new person is everyone’s job, nobody does it.
What if we have no documentation to give them? Have them write it as they learn. A newcomer notices every step the team has stopped seeing. Ask for the setup steps and a one-page description of each system they touch, and have its owner correct them.
If the system your new engineer is inheriting is one that nobody left on the team can explain, a System Evaluation gives you an independent written account of it for a fixed fee.